Phase-in
of AB 715 begins in 2010 and requires an increasing percentage of models to be high
efficiency during a four-year period. It requires 100 percent by January 2014.
It prescribes a specific timetable that will
provide the industry with the necessary time to gradually convert existing
1.6-gpf models to high efficiency models.