Latest News / Operations & Technology

PPI for materials slips but price hikes loom for some

November 21, 2012
/ Print / Reprints /
ShareMore
/ Text Size+
Nonresidential construction starts jump.

The producer price index (PPI) for finished goods fell 0.2% in October, not seasonally adjusted (also -0.2%, seasonally adjusted) and rose 2.3% over 12 months, the Bureau of Labor Statistics (BLS) reported on Wednesday. The PPI for inputs to construction - a weighted average of the cost of all materials used in construction plus items consumed by contractors such as diesel fuel-decreased 0.4% for the month, after climbing 0.9% for two consecutive months.

Prices for key construction inputs have moved sharply in both directions since PPI data was gathered in mid-October. Scrap steel prices have climbed and steel makers have responded with numerous price increase announcements.

In other news, the value of nonresidential construction starts in October jumped 20% from a year earlier, Reed Construction Data reported, based on data it collected. Starts for the first 10 months of 2012 combined rose 10.5% from the same period in 2011. Nonresidential building starts climbed 8.7% year-to-date, with gains of 17.5% for commercial starts; industrial (manufacturing) starts, 12.5%; and institutional starts, 3.0%. Heavy engineering (nonbuilding) starts rose 13%.

For more information, view the October PPI table here.


Source: AGC of America

Links

Did you enjoy this article? Click here to subscribe to Supply House Times.
You must login or register in order to post a comment.

Multimedia

Videos

Image Galleries

BNP Media's Plumbing Group Visits Grundfos North American Headquarters

BNP Media’s Plumbing Group, comprised of the Plumbing & Mechanical, Supply House Times, PM Engineer (pme) and Reeves Journal brands, recently visited Grundfos’ new North American headquarters building in the western Chicago suburb of Downers Grove, Ill.

8/26/14 1:00 pm EST

Free Webinar: Low Temperature Heat Emitter Options in Hydronic Systems

With proper design, you can create systems that require supply water temperatures no higher than 120° F under design load conditions.

Supply House Times

August 2014

2014 August

In the August issue of Supply House Times, see what NetworkASA 2014 has to offer in terms of education and networking within the industry. WIT & Co. are celebrating a milestone, read about the 2014 SWA Convention, and see what classes the ASA Education Foundation has to offer. Also, discover the latest products and technologies in the supply chain/distribution industry.
Table Of Contents Subscribe

Supply House Times Poll

Back to School

It’s back-to-school time, how do you stay knowledgeable on the industry:
View Results Poll Archive

The Supply House Times Store

plumbing-hvac.gif
2014 National Plumbing & HVAC Estimator

Every plumbing and HVAC estimator can use the cost estimates in this practical manual!

More Products

Clear Seas Research

CS-OflRGBhomepage.jpgWith access to over one million professionals and more than 60 industry-specific publications,Clear Seas Research offers relevant insights from those who know your industry best. Let us customize a market research solution that exceeds your marketing goals.

Premier 125

Premier 125 button

The information SUPPLY HOUSE TIMES uses to rank the Premier 125 is the most accurate we can gather. It is primarily based on responses to a questionnaire we send to the wholesalers in our database, supplemented with information obtained from industry reports and estimates.

STAY CONNECTED

facebook Twitter Updated icon Youtube Updated icon    LinkedIn Updated icon  Google+